Tri-objective parallel machine with job splitting and sequence dependent setup times using differential evolution and particle swarm optimization
Parallel machines scheduling problems (PMSPs) exist in the industry since most manufacturing operations aim to produce lots of similar products in a defined time period. Some incoming jobs have different sizes and due dates; plus, the production capacity, setup time, job processing time and energy r...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Novi Sad, Faculty of Technical Sciences
2024-12-01
|
Series: | International Journal of Industrial Engineering and Management |
Subjects: | |
Online Access: | http://www.ijiemjournal.uns.ac.rs/images/journal/volume15/IJIEM_362.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|