Optimization on Reasonable Construction State for Cable-Stayed Bridge with Steel Box Girder Based on Multi-Objective Programming Algorithm
The reasonable construction state of a cable-stayed bridge refers to the state achieved after construction is carried out according to a specific sequence of procedures, leading to the reasonable completion status the bridge. The corresponding construction states at each stage are considered as part...
Saved in:
Main Authors: | Junbiao He, Wenhao Chai, Weiming Hu, Jie Dai, Jin Di, Fengjiang Qin |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-12-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/15/1/91 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization of Reasonable Finished State for Cable-Stayed Bridge with Steel Box Girder Based on Multiplier Path Following Method
by: Jiapeng Shi, et al.
Published: (2025-01-01) -
Development of Analytical Method for Cable-stayed Bridges Considering Local Damages Caused by Failure of Supporting Cables
by: Ahmed Ramadan Ahmed, et al.
Published: (2024-12-01) -
A numerical study on the structural integrity of self-anchored cable-stayed suspension bridges
by: Paolo Lonetti, et al.
Published: (2016-10-01) -
A numerical study on the structural integrity of self-anchored cable-stayed suspension bridges
by: Paolo Lonetti, et al.
Published: (2016-10-01) -
Effect of Initial Cable Tension on Cable-Stayed Bridge Performance and a New Construction Method
by: Hamid Dehghani, et al.
Published: (2024-11-01)