5G highway tunnel deployment scheme and performance verification

The scheme of deploying highway tunnel in 3.5 GHz typical frequency band of 5G was systematically analyzed.And the performance of the new antenna and the new leaky cable deployed for highway tunnel were comprehensively evaluated by RSRP,SINR,and rate distribution.The coverage performance,safety requ...

Full description

Saved in:
Bibliographic Details
Main Authors: Yan YANG, Tao ZHANG, Xirui GUO, Xiang PAN
Format: Article
Language:zho
Published: Beijing Xintong Media Co., Ltd 2020-10-01
Series:Dianxin kexue
Subjects:
Online Access:http://www.telecomsci.com/zh/article/doi/10.11959/j.issn.1000-0801.2020244/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841528931409199104
author Yan YANG
Tao ZHANG
Xirui GUO
Xiang PAN
author_facet Yan YANG
Tao ZHANG
Xirui GUO
Xiang PAN
author_sort Yan YANG
collection DOAJ
description The scheme of deploying highway tunnel in 3.5 GHz typical frequency band of 5G was systematically analyzed.And the performance of the new antenna and the new leaky cable deployed for highway tunnel were comprehensively evaluated by RSRP,SINR,and rate distribution.The coverage performance,safety requirements,cost and other aspects of each scheme were proposed.It made up for the current research gap in this area,provided the first-hand materials for the 5G highway tunnel deployment,and effectively promoted the equipment evolution.
format Article
id doaj-art-443936d65da747c281d6771284046fdd
institution Kabale University
issn 1000-0801
language zho
publishDate 2020-10-01
publisher Beijing Xintong Media Co., Ltd
record_format Article
series Dianxin kexue
spelling doaj-art-443936d65da747c281d6771284046fdd2025-01-15T03:31:57ZzhoBeijing Xintong Media Co., LtdDianxin kexue1000-08012020-10-0136126133598128655G highway tunnel deployment scheme and performance verificationYan YANGTao ZHANGXirui GUOXiang PANThe scheme of deploying highway tunnel in 3.5 GHz typical frequency band of 5G was systematically analyzed.And the performance of the new antenna and the new leaky cable deployed for highway tunnel were comprehensively evaluated by RSRP,SINR,and rate distribution.The coverage performance,safety requirements,cost and other aspects of each scheme were proposed.It made up for the current research gap in this area,provided the first-hand materials for the 5G highway tunnel deployment,and effectively promoted the equipment evolution.http://www.telecomsci.com/zh/article/doi/10.11959/j.issn.1000-0801.2020244/5Gexpresswaytunnelcovering capacity
spellingShingle Yan YANG
Tao ZHANG
Xirui GUO
Xiang PAN
5G highway tunnel deployment scheme and performance verification
Dianxin kexue
5G
expressway
tunnel
covering capacity
title 5G highway tunnel deployment scheme and performance verification
title_full 5G highway tunnel deployment scheme and performance verification
title_fullStr 5G highway tunnel deployment scheme and performance verification
title_full_unstemmed 5G highway tunnel deployment scheme and performance verification
title_short 5G highway tunnel deployment scheme and performance verification
title_sort 5g highway tunnel deployment scheme and performance verification
topic 5G
expressway
tunnel
covering capacity
url http://www.telecomsci.com/zh/article/doi/10.11959/j.issn.1000-0801.2020244/
work_keys_str_mv AT yanyang 5ghighwaytunneldeploymentschemeandperformanceverification
AT taozhang 5ghighwaytunneldeploymentschemeandperformanceverification
AT xiruiguo 5ghighwaytunneldeploymentschemeandperformanceverification
AT xiangpan 5ghighwaytunneldeploymentschemeandperformanceverification