Operation Control Method for Degraded Trains after Shanghai Rail Transit Lines 3 and 4 Signaling System Upgrade and Renovation
Objective After the upgrade of Shanghai Rail Transit Lines 3 and 4 signaling systems, their functions are highly concentrated in the on-board train controller. In the event of on-board train controller failure leading to train degraded status, the operational capacity of the line will decrease signi...
Saved in:
| Main Author: | LI Yongzheng |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2024-11-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.11.006.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Signaling System Renovation Key Technology Solutions of Suzhou Rail Transit Line 11 and Line 3 for Through Train Operation
by: LIU Dongdong, et al.
Published: (2024-12-01) -
Signaling System Retrofit and Reverse-connection Scheme for Shanghai Rail Transit Line 13 Beidi Road Depot
by: CHU Haiping, et al.
Published: (2024-11-01) -
Research on Shanghai Rail Transit Signaling System Evolution Scheme
by: WANG Lizhou
Published: (2024-11-01) -
Platform Screen Door Interface Solutions in Signaling System Upgrading and Renovation
by: LI Cong, et al.
Published: (2024-12-01) -
Signaling System Fully Redundant On-board Architecture Suitable for TACS
by: NI Zhihao
Published: (2024-11-01)