Operation Control Method for Degraded Trains after Shanghai Rail Transit Lines 3 and 4 Signaling System Upgrade and Renovation

Objective After the upgrade of Shanghai Rail Transit Lines 3 and 4 signaling systems, their functions are highly concentrated in the on-board train controller. In the event of on-board train controller failure leading to train degraded status, the operational capacity of the line will decrease signi...

Full description

Saved in:
Bibliographic Details
Main Author: LI Yongzheng
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2024-11-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.11.006.html
Tags: Add Tag
No Tags, Be the first to tag this record!