Determination of Distance Required to Ensure Stope and Footwall-drift Non-interaction Zone based on Geological Strength Index
In the Bakibaba Copper Mine, the longhole stoping method is used in the production of copper ore. Stability problems have occurred at times on the footwall drift due to the interaction between the footwall drift and stope. In this study, we propose a method for estimating the minimum distance necess...
Saved in:
| Main Authors: | Mehmet Volkan Ozdogan, Alper Gonen |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Universidad Nacional de Colombia
2019-01-01
|
| Series: | Earth Sciences Research Journal |
| Subjects: | |
| Online Access: | https://revistas.unal.edu.co/index.php/esrj/article/view/71879 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Effects of reservoir regulation on downstream benthic invertebrate drift in dammed rivers: A review
by: Jiaxuan Tang, et al.
Published: (2025-03-01) -
Research of wind-snow drift uneven distribution on arched structure roofs
by: Wang Jianshuo, et al.
Published: (2025-01-01) -
Effect of foundation rigidity of reinforced concrete MRF-wall on lateral force and drift
by: Iman Hakamian
Published: (2025-03-01) -
Linear stabilization for a degenerate wave equation in non divergence form with drift
by: Genni Fragnelli, et al.
Published: (2025-08-01) -
On-chip manipulation of trion drift in suspended WS2 monolayer at room temperature
by: Choi Woo Hun, et al.
Published: (2025-03-01)