Layout of the Honghua Hydropower Station and the Optimized Design of the Relevant Buildings
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2007-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47664793&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841534228343291904 |
---|---|
author | LING Chun-hai |
author_facet | LING Chun-hai |
author_sort | LING Chun-hai |
collection | DOAJ |
format | Article |
id | doaj-art-28c9ad01fcae42078366182708958a7e |
institution | Kabale University |
issn | 1001-9235 |
language | zho |
publishDate | 2007-01-01 |
publisher | Editorial Office of Pearl River |
record_format | Article |
series | Renmin Zhujiang |
spelling | doaj-art-28c9ad01fcae42078366182708958a7e2025-01-15T02:43:11ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352007-01-012847664793Layout of the Honghua Hydropower Station and the Optimized Design of the Relevant BuildingsLING Chun-haihttp://www.renminzhujiang.cn/thesisDetails?columnId=47664793&Fpath=home&index=0 |
spellingShingle | LING Chun-hai Layout of the Honghua Hydropower Station and the Optimized Design of the Relevant Buildings Renmin Zhujiang |
title | Layout of the Honghua Hydropower Station and the Optimized Design of the Relevant Buildings |
title_full | Layout of the Honghua Hydropower Station and the Optimized Design of the Relevant Buildings |
title_fullStr | Layout of the Honghua Hydropower Station and the Optimized Design of the Relevant Buildings |
title_full_unstemmed | Layout of the Honghua Hydropower Station and the Optimized Design of the Relevant Buildings |
title_short | Layout of the Honghua Hydropower Station and the Optimized Design of the Relevant Buildings |
title_sort | layout of the honghua hydropower station and the optimized design of the relevant buildings |
url | http://www.renminzhujiang.cn/thesisDetails?columnId=47664793&Fpath=home&index=0 |
work_keys_str_mv | AT lingchunhai layoutofthehonghuahydropowerstationandtheoptimizeddesignoftherelevantbuildings |