Quality Control for Construction of Concrete Cutoff Wall of Dahe Reservoir
Saved in:
Main Authors: | 朱存忠, 吴金第 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2003-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47669996&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Controlled Blasting Test in Quarrying for Concrete Faced Rockfill Dam of Dahe Reservoir
by: 马忠旭
Published: (2003-01-01) -
Application of Concrete Cutoff Wall to Extended Tiegang Reservoir Project
by: WU Shu-hong
Published: (2009-01-01) -
Embankment Cutoff Wall Construction with Complicated Conditions
by: WANG Yong-jian
Published: (2009-01-01) -
Application of Water Jetting Method to Concrete Cutoff Wall Construction in Reinforcement of Beijiang Embankment
by: LIAO Bo-ying, et al.
Published: (2009-01-01) -
Impervious Curtain Grouting Technique in the Dam Site of Dahe Reservoir in Tengchong County
by: LIU Kuanfang, et al.
Published: (2006-01-01)