Signaling System Renovation Key Technology Solutions of Suzhou Rail Transit Line 11 and Line 3 for Through Train Operation

[Objective]To enable the through train operation between Suzhou Rail Transit Line 11 and Line 3, a customized signaling system upgrade solution is required based on the unique characteristics and operational demands of the lines, aiming to achieve the technical goals of 'one line, one plan'...

Full description

Saved in:
Bibliographic Details
Main Authors: LIU Dongdong, ZHOU Yi, SHI Yufeng, TANG Tao
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2024-12-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.12.061.html
Tags: Add Tag
No Tags, Be the first to tag this record!