Signaling System Renovation Key Technology Solutions of Suzhou Rail Transit Line 11 and Line 3 for Through Train Operation
[Objective]To enable the through train operation between Suzhou Rail Transit Line 11 and Line 3, a customized signaling system upgrade solution is required based on the unique characteristics and operational demands of the lines, aiming to achieve the technical goals of 'one line, one plan'...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2024-12-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.12.061.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|