Trial Design of a Truss Bridge Prefabricated Using a Rectangular Steel Tube—Ultra-High-Performance Concrete Composite
In order to promote the development of bridge assembly technology and accelerate the application of rectangular steel-tube–concrete composite truss bridges, this study focuses on the Yellow River Diversion Jiqing Main Canal Bridge as the engineering example and conducts a numerical analysis of a rec...
Saved in:
| Main Authors: | , , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2024-12-01
|
| Series: | Applied Sciences |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2076-3417/14/23/11244 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|