Life cycle management of capital construction object with minimization of atmospheric air pollution
Introduction. The existing approaches to management decision-making in construction production give the opportunity to select options only for a certain stage of the capital construction object life cycle (LC CCO), not considering their effectiveness throughout the whole LC. To eliminate this disadv...
Saved in:
Main Authors: | V. N. Azarov, O. V. Burlachenko, A. O. Burlachenko, M. D. Azarova |
---|---|
Format: | Article |
Language: | English |
Published: |
Moscow State University of Civil Engineering (MGSU)
2024-03-01
|
Series: | Vestnik MGSU |
Subjects: | |
Online Access: | https://www.vestnikmgsu.ru/jour/article/view/219 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Method for determining effectiveness of cleaning devices for PM2.5 and PM10 suspended particles in dusty industrial emissions
by: L. O. Shtripling, et al.
Published: (2019-06-01) -
Seasonal Variations and Long-term Trend of Mineral Dust Aerosols over the Taiwan Region
by: Yanda Zhang, et al.
Published: (2020-11-01) -
Influence of Limestone Dust on PV Panel Efficiency in a Small Solar Park in Bulgaria
by: Penka Zlateva, et al.
Published: (2025-01-01) -
Using the Hierarchy Analysis Method when choosing dust cleaning equipment for foundry
by: V. Yu. Solomin, et al.
Published: (2023-06-01) -
Opposite Effects of Mineral Dust Nonsphericity and Size on Dust‐Induced Snow Albedo Reduction
by: Tenglong Shi, et al.
Published: (2022-06-01)