General Design and Layout of Datengxia Hydropower Station
Datengxia hydropower station is a riverbed power station with a low water head and large flow.It is installed with eight 200 MW axial-flow paddle turbine generating sets,with an average annual generating capacity of 6.055 billion kW·h,which makes early and remarkable economic benefits of generating...