Catch Hold of the Core of the Design and Control the Project Fabrication Cost
Saved in:
Main Author: | YANG Yi-zhong |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2006-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47666520&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Fabricating Cost Management at the Construction Stage of Water Projects
by: LU Kangzhen
Published: (2006-01-01) -
Micropattern of core-shell Ag@MCS/PEGDA nanoparticles fabricated by femtosecond laser maskless optical projection lithography
by: Fan-Chun Bin, et al.
Published: (2025-01-01) -
Attempting to catch the Shadows
by: Simona Aleksynaitė
Published: (2024-12-01) -
A SYSTEM DYNAMICS MODEL TO DETERMINE THE VALUE OF INVENTORY HOLDING COST
by: BABATUNDE OMONIYI ODEDAIRO, et al.
Published: (2020-07-01) -
Application of Project Management Theory to Project Cost Control
by: CHEN Zu-tian
Published: (2008-01-01)