Optimization and Rule Analysis of Drawdown Level before Flood Season of Longtan Hydropower Station
Longtan Hydropower Station is the controlled reservoir of the Hongshui River.It is of significance for flood control,water supply,and power safety to study the optimal drawdown level before flood seasons in this station.Based on analyzing the drawdown level and operation requirements of Longtan Hydr...
Saved in:
Main Authors: | LIU Yongqi, HOU Guibing, GAO Weishan, LI Yuanyuan, WANG Baohua, LI Peng |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2023-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.10.010 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on River System Flood Forecasting Scheme for Longtan Hydropower Station Interval in Hongshui River
by: DU Yong, et al.
Published: (2024-01-01) -
Study on Flood Season Staging in Longtan Reservoir Based on Fisher Optimal Dissection Method
by: LI Dongqin, et al.
Published: (2021-01-01) -
Compressibility characteristics and modification effect of coal reservoirs in Longtan Formation, Nanchuan area, southeast Chongqing
by: Jinxian LIU, et al.
Published: (2025-01-01) -
The Development of Drawdown Dolines and Subsidence Dolines with the Comparison of Their Bedrock Resistivities—A Case Study
by: Márton Veress
Published: (2025-01-01) -
General Design and Layout of Datengxia Hydropower Station
by: ZHANG Xiao, et al.
Published: (2022-01-01)