Stability Impact Analysis of Main Construction of High-Slope PBA Concealed Excavation Metro Station
To address the issues of significant deformation and insufficient stability during the construction of a high-slope metro station, a study was conducted using indoor tests, numerical simulations, and on-site monitoring, based on a metro station in Xi’an City. Finite element analysis software was use...
Saved in:
| Main Authors: | Tieyin Zhang, Lei Qiang, Xinyu Qian, Guanhua Cui, Peilong Yuan, Qiang Wang, Kunlong Zheng |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2025-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/adce/2371680 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Numerical Simulation of Slope Excavation and Stability Under Earthquakes in Cataclastic Loose Rock Mass of Hydropower Station on Lancang River
by: Wenjing Liu, et al.
Published: (2025-07-01) -
Experimental Study on Structural Form and Excavation Model of Urban Metro Cross Transfer Station with Super Large Cross Section and Shallow Excavation
by: Zhi Lin, et al.
Published: (2020-01-01) -
Numerical Analysis and Deformation Mechanism Study on an Excavated High-Steep Slope of a Hydropower Station
by: Guangcheng Shi, et al.
Published: (2020-01-01) -
A Multi-Method Approach to the Stability Evaluation of Excavated Slopes with Weak Interlayers: Insights from Catastrophe Theory and Energy Principles
by: Tao Deng, et al.
Published: (2025-06-01) -
Influence of Zhengzhou Metro Shield Construction on Adjacent Structures and Strata: A Case Study of an Existing Subway Station
by: Zhengya ZHANG, et al.
Published: (2025-06-01)