Optimal schedule for extended basic period approach of economic lot scheduling problem
Most algorithms for the economic lot scheduling problem (elsp) following the extended basic period approach consist of two decision levels. On the upper level, the length of the production cycle and the number of lots (frequency) within the cycle for all products are determined. On the lower level,...
Saved in:
| Main Author: | Waldemar Kaczmarczyk |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Polish Academy of Sciences
2025-07-01
|
| Series: | Archives of Control Sciences |
| Subjects: | |
| Online Access: | https://journals.pan.pl/Content/135713/PDF/art01_int.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Human Performance-Aware Scheduling and Routing of a Multi-Skilled Workforce
by: Maikel L. van Eck, et al.
Published: (2017-10-01) -
A Mixed-Integer Linear Programming Model for Addressing Efficient Flexible Flow Shop Scheduling Problem with Automatic Guided Vehicles Consideration
by: Dekun Wang, et al.
Published: (2025-03-01) -
Material requirements planning with a novel lot sizing method and a new algorithm for production scheduling
by: Seyed Mahdi Javadi, et al.
Published: (2025-07-01) -
Optimizing appliance scheduling for utility and budget in smart energy systems under inclining block rate tariffs
by: Ahmed Shaban, et al.
Published: (2025-09-01) -
Optimal integration of solar home systems and appliance scheduling for residential homes under severe national load shedding
by: Sakhile Twala, et al.
Published: (2023-11-01)