Mechanism of wellbore instability considering tubular-string contact with the wellbore wall
Abstract Exploration and development of deep and extended-reach wells faces extreme challenges including an extremely narrow mud weight window and complex well trajectories, with frequent occurrences of wellbore instability during drilling and completion operations. Tubular strings in the wellbore a...
Saved in:
| Main Authors: | Yuting Zhou, Hui Zhang, Yanxian Wu, Xingyu Li, Chuanming Xi, Kunhong Lv, Hao Zhang, Xinrui Wang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Nature Portfolio
2025-07-01
|
| Series: | Scientific Reports |
| Subjects: | |
| Online Access: | https://doi.org/10.1038/s41598-025-10714-7 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Examination of a patient with renal tubular acidosis: renal tubular acidosis with hyperparathyroidism, pheochromocytoma, and multiple kidney stones: a case report
by: Marzieh Nasiri Sangari, et al.
Published: (2025-06-01) -
Minimally Invasive Discectomy and Decompression for Lumbar Spine using Tubular Retractor System: Technique, Learning Curve and Outcomes
by: V A Kumar, et al.
Published: (2022-08-01) -
Single-Cell Profiling of Tubular Epithelial Cells in Adaptive State in the Urine Sediment of Patients With Early and Advanced Diabetic Kidney Disease
by: Dongzhao Ma, et al.
Published: (2025-03-01) -
Rickets due to renal tubular acidosis: A case report and our perspective
by: Pankaj Singhania, et al.
Published: (2022-01-01) -
OBTAINING NEW THIN WALLED TUBULAR STRUCTURES THROUGH MATRIX MORPHOLOGICAL RESEARCH
by: VLAD ANDREI CIUBOTARIU, et al.
Published: (2021-06-01)