Influence on Existing Underlying Metro Tunnel Deformation from Small Clear-Distance Rectangular Box Jacking: Monitoring and Simulation

Rectangular box jacking is widely used in densely developed urban areas. However, when conducted with limited clear distance near existing metro tunnels, it introduces considerable structural safety risks. This study investigates a large-section rectangular box jacking project in Suzhou that crosses...

Full description

Saved in:
Bibliographic Details
Main Authors: Chong Ma, Hao Zhou, Baosong Ma
Format: Article
Language:English
Published: MDPI AG 2025-07-01
Series:Buildings
Subjects:
Online Access:https://www.mdpi.com/2075-5309/15/14/2547
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849246450567872512
author Chong Ma
Hao Zhou
Baosong Ma
author_facet Chong Ma
Hao Zhou
Baosong Ma
author_sort Chong Ma
collection DOAJ
description Rectangular box jacking is widely used in densely developed urban areas. However, when conducted with limited clear distance near existing metro tunnels, it introduces considerable structural safety risks. This study investigates a large-section rectangular box jacking project in Suzhou that crosses a double-line metro tunnel with minimal vertical clear distance. Integrated field monitoring and finite element simulations were conducted to analyze the tunnel’s deformation behavior during various jacking phases. The results show that the upline tunnel experienced greater uplift than the downline tunnel, with maximum vertical displacement occurring directly beneath the jacking axis. The affected zone extended approximately 20 m beyond the pipe gallery boundaries. Both the tunnel vault and ballast bed exhibited vertical uplift, while the hance displaced laterally toward the launching shaft. These deformations showed clear stage-dependent patterns strongly influenced by the relative position of the jacking machine. Numerical simulations demonstrated that doubling the pipe–tunnel clearance reduced the vault displacement by 58.87% (upline) and 51.95% (downline). Increasing the pipe–slurry friction coefficient from 0.1 to 0.3 caused the hance displacement difference to rise from 0.12 mm to 0.36 mm. Further sensitivity analysis reveals that when the jacking machine is positioned directly above the tunnel, grouting pressure is the greatest influence on the structural response and must be carefully controlled. The proposed methodology and findings offer valuable insights for future applications in similar tunnelling projects.
format Article
id doaj-art-fb196e5ed8f84f9f8cc0bf78ed13dab8
institution Kabale University
issn 2075-5309
language English
publishDate 2025-07-01
publisher MDPI AG
record_format Article
series Buildings
spelling doaj-art-fb196e5ed8f84f9f8cc0bf78ed13dab82025-08-20T03:58:30ZengMDPI AGBuildings2075-53092025-07-011514254710.3390/buildings15142547Influence on Existing Underlying Metro Tunnel Deformation from Small Clear-Distance Rectangular Box Jacking: Monitoring and SimulationChong Ma0Hao Zhou1Baosong Ma2Liangshan Engineering Technology (Wuhan) Co., Ltd., Wuhan 430015, ChinaSchool of Civil Engineering, Sun Yat-sen University, Guangzhou 510275, ChinaSchool of Civil Engineering, Sun Yat-sen University, Guangzhou 510275, ChinaRectangular box jacking is widely used in densely developed urban areas. However, when conducted with limited clear distance near existing metro tunnels, it introduces considerable structural safety risks. This study investigates a large-section rectangular box jacking project in Suzhou that crosses a double-line metro tunnel with minimal vertical clear distance. Integrated field monitoring and finite element simulations were conducted to analyze the tunnel’s deformation behavior during various jacking phases. The results show that the upline tunnel experienced greater uplift than the downline tunnel, with maximum vertical displacement occurring directly beneath the jacking axis. The affected zone extended approximately 20 m beyond the pipe gallery boundaries. Both the tunnel vault and ballast bed exhibited vertical uplift, while the hance displaced laterally toward the launching shaft. These deformations showed clear stage-dependent patterns strongly influenced by the relative position of the jacking machine. Numerical simulations demonstrated that doubling the pipe–tunnel clearance reduced the vault displacement by 58.87% (upline) and 51.95% (downline). Increasing the pipe–slurry friction coefficient from 0.1 to 0.3 caused the hance displacement difference to rise from 0.12 mm to 0.36 mm. Further sensitivity analysis reveals that when the jacking machine is positioned directly above the tunnel, grouting pressure is the greatest influence on the structural response and must be carefully controlled. The proposed methodology and findings offer valuable insights for future applications in similar tunnelling projects.https://www.mdpi.com/2075-5309/15/14/2547rectangular box jackingmetro tunneldisplacementfield monitoringnumerical simulation
spellingShingle Chong Ma
Hao Zhou
Baosong Ma
Influence on Existing Underlying Metro Tunnel Deformation from Small Clear-Distance Rectangular Box Jacking: Monitoring and Simulation
Buildings
rectangular box jacking
metro tunnel
displacement
field monitoring
numerical simulation
title Influence on Existing Underlying Metro Tunnel Deformation from Small Clear-Distance Rectangular Box Jacking: Monitoring and Simulation
title_full Influence on Existing Underlying Metro Tunnel Deformation from Small Clear-Distance Rectangular Box Jacking: Monitoring and Simulation
title_fullStr Influence on Existing Underlying Metro Tunnel Deformation from Small Clear-Distance Rectangular Box Jacking: Monitoring and Simulation
title_full_unstemmed Influence on Existing Underlying Metro Tunnel Deformation from Small Clear-Distance Rectangular Box Jacking: Monitoring and Simulation
title_short Influence on Existing Underlying Metro Tunnel Deformation from Small Clear-Distance Rectangular Box Jacking: Monitoring and Simulation
title_sort influence on existing underlying metro tunnel deformation from small clear distance rectangular box jacking monitoring and simulation
topic rectangular box jacking
metro tunnel
displacement
field monitoring
numerical simulation
url https://www.mdpi.com/2075-5309/15/14/2547
work_keys_str_mv AT chongma influenceonexistingunderlyingmetrotunneldeformationfromsmallcleardistancerectangularboxjackingmonitoringandsimulation
AT haozhou influenceonexistingunderlyingmetrotunneldeformationfromsmallcleardistancerectangularboxjackingmonitoringandsimulation
AT baosongma influenceonexistingunderlyingmetrotunneldeformationfromsmallcleardistancerectangularboxjackingmonitoringandsimulation