A Practical Design Method to Determine the Replacement Time of Light Embankment
If the settlement of bridgehead transition section of expressway is too large, it often causes frequent vehicle jumping at bridgehead and endangers passenger safety. The engineering practice has proved that the lightweight embankment replacement technology can reduce the postconstruction settlement...
Saved in:
Main Authors: | Fei Zhou, Fan Yu, Tangdai Xia, Bingqi Yu, Yingtao Hu |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Geofluids |
Online Access: | http://dx.doi.org/10.1155/2022/2640552 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep
by: Fei Zhou, et al.
Published: (2021-01-01) -
Analysis of Design of Ecologic Embankment
by: ZHU San-hua, et al.
Published: (2005-01-01) -
Stability Analysis in High Filled Embankment Design
by: OU Wen-chang, et al.
Published: (2007-01-01) -
Planning and Design of Embankment Project of Nanning City
by: 覃锡武
Published: (2001-01-01) -
Approach to Determination of Crest Freeboard for Pearl River's Embankment at Guangzhou
by: 黄岳文
Published: (2004-01-01)