DATA⁃DRIVEN RELIABILITY ANALYSIS MODEL OF QINGHAI⁃TIBET RAILWAY IN PERMAFROST ZONE
To ensure the safety of train operation in the plateau permafrost region of the Golmud⁃Lhasa section of the Qinghai Tibet Railway Phase II project,based on the original time series elevation data of railway subgrade in permafrost region,the product season model under various subgrade types is establ...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Journal of Mechanical Strength
2024-08-01
|
Series: | Jixie qiangdu |
Subjects: | |
Online Access: | http://www.jxqd.net.cn/thesisDetails#10.16579/j.issn.1001.9669.2024.04.020 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841534133977743360 |
---|---|
author | WANG JinBo TANG JiaYin LIU XinLing WU Yi |
author_facet | WANG JinBo TANG JiaYin LIU XinLing WU Yi |
author_sort | WANG JinBo |
collection | DOAJ |
description | To ensure the safety of train operation in the plateau permafrost region of the Golmud⁃Lhasa section of the Qinghai Tibet Railway Phase II project,based on the original time series elevation data of railway subgrade in permafrost region,the product season model under various subgrade types is established to fit the uneven settlement degradation trajectory of subgrade and effectively predicted elevation values with confidence intervals.The differential operation was used to analyze the subgrade settlement degradation values.The failure time extrapolation method was used to complete the reliability evaluation,and the settlement threshold was set based on driving safety.The simulation results show that it can accurately forecast permafrost thawing degradation,and the research findings can be used by the logistics support department to conduct daily subgrade maintenance. |
format | Article |
id | doaj-art-f7354b7591e9458faf592d6a12110e45 |
institution | Kabale University |
issn | 1001-9669 |
language | zho |
publishDate | 2024-08-01 |
publisher | Editorial Office of Journal of Mechanical Strength |
record_format | Article |
series | Jixie qiangdu |
spelling | doaj-art-f7354b7591e9458faf592d6a12110e452025-01-15T02:46:01ZzhoEditorial Office of Journal of Mechanical StrengthJixie qiangdu1001-96692024-08-014690591379314430DATA⁃DRIVEN RELIABILITY ANALYSIS MODEL OF QINGHAI⁃TIBET RAILWAY IN PERMAFROST ZONEWANG JinBoTANG JiaYinLIU XinLingWU YiTo ensure the safety of train operation in the plateau permafrost region of the Golmud⁃Lhasa section of the Qinghai Tibet Railway Phase II project,based on the original time series elevation data of railway subgrade in permafrost region,the product season model under various subgrade types is established to fit the uneven settlement degradation trajectory of subgrade and effectively predicted elevation values with confidence intervals.The differential operation was used to analyze the subgrade settlement degradation values.The failure time extrapolation method was used to complete the reliability evaluation,and the settlement threshold was set based on driving safety.The simulation results show that it can accurately forecast permafrost thawing degradation,and the research findings can be used by the logistics support department to conduct daily subgrade maintenance.http://www.jxqd.net.cn/thesisDetails#10.16579/j.issn.1001.9669.2024.04.020Permafrost thawingSARIMA modelDegradation dataReliability assessment |
spellingShingle | WANG JinBo TANG JiaYin LIU XinLing WU Yi DATA⁃DRIVEN RELIABILITY ANALYSIS MODEL OF QINGHAI⁃TIBET RAILWAY IN PERMAFROST ZONE Jixie qiangdu Permafrost thawing SARIMA model Degradation data Reliability assessment |
title | DATA⁃DRIVEN RELIABILITY ANALYSIS MODEL OF QINGHAI⁃TIBET RAILWAY IN PERMAFROST ZONE |
title_full | DATA⁃DRIVEN RELIABILITY ANALYSIS MODEL OF QINGHAI⁃TIBET RAILWAY IN PERMAFROST ZONE |
title_fullStr | DATA⁃DRIVEN RELIABILITY ANALYSIS MODEL OF QINGHAI⁃TIBET RAILWAY IN PERMAFROST ZONE |
title_full_unstemmed | DATA⁃DRIVEN RELIABILITY ANALYSIS MODEL OF QINGHAI⁃TIBET RAILWAY IN PERMAFROST ZONE |
title_short | DATA⁃DRIVEN RELIABILITY ANALYSIS MODEL OF QINGHAI⁃TIBET RAILWAY IN PERMAFROST ZONE |
title_sort | data⁃driven reliability analysis model of qinghai⁃tibet railway in permafrost zone |
topic | Permafrost thawing SARIMA model Degradation data Reliability assessment |
url | http://www.jxqd.net.cn/thesisDetails#10.16579/j.issn.1001.9669.2024.04.020 |
work_keys_str_mv | AT wangjinbo datadrivenreliabilityanalysismodelofqinghaitibetrailwayinpermafrostzone AT tangjiayin datadrivenreliabilityanalysismodelofqinghaitibetrailwayinpermafrostzone AT liuxinling datadrivenreliabilityanalysismodelofqinghaitibetrailwayinpermafrostzone AT wuyi datadrivenreliabilityanalysismodelofqinghaitibetrailwayinpermafrostzone |