APA (7th ed.) Citation

Dasen, C. Optimization of Tailwater Pipe Installation Scheme for Luoning Pumped Storage Power Station in Henan Province. Editorial Office of Pearl River.

Chicago Style (17th ed.) Citation

Dasen, CHEN. Optimization of Tailwater Pipe Installation Scheme for Luoning Pumped Storage Power Station in Henan Province. Editorial Office of Pearl River.

MLA (9th ed.) Citation

Dasen, CHEN. Optimization of Tailwater Pipe Installation Scheme for Luoning Pumped Storage Power Station in Henan Province. Editorial Office of Pearl River.

Warning: These citations may not always be 100% accurate.