Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta
The water resources allocation projects in the Pearl River Delta are characterized by multiple points,long lines,complex technology,long construction periods,and difficult coordination. On this basis,new information technologies such as BIM,GIS,electronic signature,cloud computing,big data,Internet...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2022-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.02.005 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841535905875099648 |
---|---|
author | DU Canyang DENG Peng ZHANG Zhaobo ZHU Xiaobin |
author_facet | DU Canyang DENG Peng ZHANG Zhaobo ZHU Xiaobin |
author_sort | DU Canyang |
collection | DOAJ |
description | The water resources allocation projects in the Pearl River Delta are characterized by multiple points,long lines,complex technology,long construction periods,and difficult coordination. On this basis,new information technologies such as BIM,GIS,electronic signature,cloud computing,big data,Internet of Things (IoT),artificial intelligence (AI),and mobile Internet are applied to build a whole-life-cycle BIM+GIS system platform by integrated innovation and collaborative sharing. It incorporates an information-based standard system,a resource pool for engineering big data,a BIM+GIS support platform,a system for electronic signature applications,a multi-information awareness and early warning platform with visual analysis,and a situation-assisted decision application based on a BIM+GIS project panorama.The whole-life-cycle BIM+GIS system platform serves all the participating units including industry supervision and the construction,design,supervision,and safety monitoring of engineering.The digitization,information,and intelligence levels of engineering construction management have reached internationally advanced levels. |
format | Article |
id | doaj-art-f25bc857f01d4ba2a7f29eba38593846 |
institution | Kabale University |
issn | 1001-9235 |
language | zho |
publishDate | 2022-01-01 |
publisher | Editorial Office of Pearl River |
record_format | Article |
series | Renmin Zhujiang |
spelling | doaj-art-f25bc857f01d4ba2a7f29eba385938462025-01-15T02:26:59ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352022-01-014347644460Application of BIM+GIS in Water Resources Allocation Project of the Pearl River DeltaDU CanyangDENG PengZHANG ZhaoboZHU XiaobinThe water resources allocation projects in the Pearl River Delta are characterized by multiple points,long lines,complex technology,long construction periods,and difficult coordination. On this basis,new information technologies such as BIM,GIS,electronic signature,cloud computing,big data,Internet of Things (IoT),artificial intelligence (AI),and mobile Internet are applied to build a whole-life-cycle BIM+GIS system platform by integrated innovation and collaborative sharing. It incorporates an information-based standard system,a resource pool for engineering big data,a BIM+GIS support platform,a system for electronic signature applications,a multi-information awareness and early warning platform with visual analysis,and a situation-assisted decision application based on a BIM+GIS project panorama.The whole-life-cycle BIM+GIS system platform serves all the participating units including industry supervision and the construction,design,supervision,and safety monitoring of engineering.The digitization,information,and intelligence levels of engineering construction management have reached internationally advanced levels.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.02.005BIM+GISstandard systeminformatizationdigital |
spellingShingle | DU Canyang DENG Peng ZHANG Zhaobo ZHU Xiaobin Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta Renmin Zhujiang BIM+GIS standard system informatization digital |
title | Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta |
title_full | Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta |
title_fullStr | Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta |
title_full_unstemmed | Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta |
title_short | Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta |
title_sort | application of bim gis in water resources allocation project of the pearl river delta |
topic | BIM+GIS standard system informatization digital |
url | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.02.005 |
work_keys_str_mv | AT ducanyang applicationofbimgisinwaterresourcesallocationprojectofthepearlriverdelta AT dengpeng applicationofbimgisinwaterresourcesallocationprojectofthepearlriverdelta AT zhangzhaobo applicationofbimgisinwaterresourcesallocationprojectofthepearlriverdelta AT zhuxiaobin applicationofbimgisinwaterresourcesallocationprojectofthepearlriverdelta |