Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta

The water resources allocation projects in the Pearl River Delta are characterized by multiple points,long lines,complex technology,long construction periods,and difficult coordination. On this basis,new information technologies such as BIM,GIS,electronic signature,cloud computing,big data,Internet...

Full description

Saved in:
Bibliographic Details
Main Authors: DU Canyang, DENG Peng, ZHANG Zhaobo, ZHU Xiaobin
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2022-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.02.005
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841535905875099648
author DU Canyang
DENG Peng
ZHANG Zhaobo
ZHU Xiaobin
author_facet DU Canyang
DENG Peng
ZHANG Zhaobo
ZHU Xiaobin
author_sort DU Canyang
collection DOAJ
description The water resources allocation projects in the Pearl River Delta are characterized by multiple points,long lines,complex technology,long construction periods,and difficult coordination. On this basis,new information technologies such as BIM,GIS,electronic signature,cloud computing,big data,Internet of Things (IoT),artificial intelligence (AI),and mobile Internet are applied to build a whole-life-cycle BIM+GIS system platform by integrated innovation and collaborative sharing. It incorporates an information-based standard system,a resource pool for engineering big data,a BIM+GIS support platform,a system for electronic signature applications,a multi-information awareness and early warning platform with visual analysis,and a situation-assisted decision application based on a BIM+GIS project panorama.The whole-life-cycle BIM+GIS system platform serves all the participating units including industry supervision and the construction,design,supervision,and safety monitoring of engineering.The digitization,information,and intelligence levels of engineering construction management have reached internationally advanced levels.
format Article
id doaj-art-f25bc857f01d4ba2a7f29eba38593846
institution Kabale University
issn 1001-9235
language zho
publishDate 2022-01-01
publisher Editorial Office of Pearl River
record_format Article
series Renmin Zhujiang
spelling doaj-art-f25bc857f01d4ba2a7f29eba385938462025-01-15T02:26:59ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352022-01-014347644460Application of BIM+GIS in Water Resources Allocation Project of the Pearl River DeltaDU CanyangDENG PengZHANG ZhaoboZHU XiaobinThe water resources allocation projects in the Pearl River Delta are characterized by multiple points,long lines,complex technology,long construction periods,and difficult coordination. On this basis,new information technologies such as BIM,GIS,electronic signature,cloud computing,big data,Internet of Things (IoT),artificial intelligence (AI),and mobile Internet are applied to build a whole-life-cycle BIM+GIS system platform by integrated innovation and collaborative sharing. It incorporates an information-based standard system,a resource pool for engineering big data,a BIM+GIS support platform,a system for electronic signature applications,a multi-information awareness and early warning platform with visual analysis,and a situation-assisted decision application based on a BIM+GIS project panorama.The whole-life-cycle BIM+GIS system platform serves all the participating units including industry supervision and the construction,design,supervision,and safety monitoring of engineering.The digitization,information,and intelligence levels of engineering construction management have reached internationally advanced levels.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.02.005BIM+GISstandard systeminformatizationdigital
spellingShingle DU Canyang
DENG Peng
ZHANG Zhaobo
ZHU Xiaobin
Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta
Renmin Zhujiang
BIM+GIS
standard system
informatization
digital
title Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta
title_full Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta
title_fullStr Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta
title_full_unstemmed Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta
title_short Application of BIM+GIS in Water Resources Allocation Project of the Pearl River Delta
title_sort application of bim gis in water resources allocation project of the pearl river delta
topic BIM+GIS
standard system
informatization
digital
url http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.02.005
work_keys_str_mv AT ducanyang applicationofbimgisinwaterresourcesallocationprojectofthepearlriverdelta
AT dengpeng applicationofbimgisinwaterresourcesallocationprojectofthepearlriverdelta
AT zhangzhaobo applicationofbimgisinwaterresourcesallocationprojectofthepearlriverdelta
AT zhuxiaobin applicationofbimgisinwaterresourcesallocationprojectofthepearlriverdelta