Including Lifetime Hydraulic Turbine Cost into Short-Term Hybrid Scheduling of Hydro and Solar
In traditional short-term hydropower scheduling problems, which usually determine the optimal power generation schedules within one week, the off-design zone of a hydraulic turbine is modeled as a forbidden zone due to the significantly increased risk of turbine damage when operating within this zon...
Saved in:
| Main Authors: | Jiehong Kong, Igor Iliev, Hans Ivar Skjelbred |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2024-10-01
|
| Series: | Energies |
| Subjects: | |
| Online Access: | https://www.mdpi.com/1996-1073/17/21/5246 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
THE APPLICATION OF FRACTURE MECHANICS TO PREDICT THE FRANCIS HYDRAULIC TURBINES LIFETIME
by: E. V. Georgievskaia
Published: (2019-01-01) -
Dynamic scheduling algorithm for streaming media based on CDN
by: YANG Ge1, et al.
Published: (2009-01-01) -
Improving the job shop scheduling algorithm to minimize total penalty costs considering maintenance activity
by: Puryani Puryani, et al.
Published: (2024-12-01) -
Fuzzy maintenance costs of a wind turbine pitch control device
by: Mariana Carvalho, et al.
Published: (2015-07-01) -
An Experimental Study of a Pico Hydro Turbine
by: Ufuk Durmaz, et al.
Published: (2022-10-01)