Including Lifetime Hydraulic Turbine Cost into Short-Term Hybrid Scheduling of Hydro and Solar

In traditional short-term hydropower scheduling problems, which usually determine the optimal power generation schedules within one week, the off-design zone of a hydraulic turbine is modeled as a forbidden zone due to the significantly increased risk of turbine damage when operating within this zon...

Full description

Saved in:
Bibliographic Details
Main Authors: Jiehong Kong, Igor Iliev, Hans Ivar Skjelbred
Format: Article
Language:English
Published: MDPI AG 2024-10-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/17/21/5246
Tags: Add Tag
No Tags, Be the first to tag this record!