A mixed-integer programming model for cycle time minimization in assembly line balancing: Using rework stations for performing parallel tasks
In assembly lines, rework stations are generally used for reprocessing defective items. On the other hand, using rework stations for this purpose only might cause inefficient usage of the resources in this station especially in an assembly line with a low defective rate. In this study, a mixed-integ...
Saved in:
| Main Authors: | F. Cavdur, E. Kaymaz |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Universitat Politècnica de València
2020-07-01
|
| Series: | International Journal of Production Management and Engineering |
| Subjects: | |
| Online Access: | https://polipapers.upv.es/index.php/IJPME/article/view/12368 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
COMPARISON OF CONSTRUCTION RELATED REWORK IN UGANDA AND MOZAMBIQUE
by: John M. Kakitahi, et al.
Published: (2014-05-01) -
REWORK COST ON BUILDING PROJECTS IN THE SOUTH WESTERN PART OF NIGERIA
by: Olatunji Ayodeji Aiyetan
Published: (2014-05-01) -
Determining EOQ Regarding the Quality of Products, Destructive Inspection, Reworking and a Review of Shortage and Deteriorating Items
by: Hassan Torabi, et al.
Published: (2022-09-01) -
Psychological artificial intelligence: Designing algorithms to deal with the uncertainty of rework in construction
by: Peter E.D. Love, et al.
Published: (2024-12-01) -
Smart manufacturing system with rework and partial outsourcing for battery industry
by: Ritu Arora, et al.
Published: (2025-02-01)