The Impact of Resource Efficiency (5M) on Bore Pile Work Productivity
Bore pile foundation work is an important stage in construction that requires high productivity to achieve the desired time and quality targets. However, productivity is often hampered by constraints on 5M resources. This research aims to determine the number of working hours lost due to obstacles o...
Saved in:
| Main Authors: | Jojok Widodo Soetjipto, Diah Ayu Restuti Wulandari, Alvira Yong Wenda Damayanti |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
University of Brawijaya
2025-06-01
|
| Series: | Rekayasa Sipil |
| Subjects: | |
| Online Access: | https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1258/671 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Data-driven approach to enhance deep foundation safety: reliable methods for predicting bored pile capacity
by: Usman Hasan Jalali, et al.
Published: (2025-08-01) -
Modern drilling technologies used for the making bored piles under the conditions of dense urban area
by: M. O. Neplevksy
Published: (2019-11-01) -
Field study of bearing performance of combined grouted piles in strongly weathered mudstone strata with bored piles
by: Xiaoduo Ou, et al.
Published: (2025-07-01) -
Reculiarities of technological impact of construction machines used for pile foundation installation St. Petersburg
by: A. B. Ponomarev, et al.
Published: (2025-07-01) -
PileBetaGR: An R-based integrative tool for predicting the geometric reliability index of piles using load-displacement curves
by: Xing Zheng Wu
Published: (2025-05-01)