Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty

Abstract Aiming at the optimal scheduling problem of virtual power plant (VPP) with multiple uncertainties on the source‐load side, this paper proposes a two‐stage stochastic robust optimal scheduling method considering the uncertainty of the source‐load side. This method combines the characteristic...

Full description

Saved in:
Bibliographic Details
Main Authors: Xiaohui Zhang, Yufei Liu
Format: Article
Language:English
Published: Wiley 2024-12-01
Series:Engineering Reports
Subjects:
Online Access:https://doi.org/10.1002/eng2.13005
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1846121541217026048
author Xiaohui Zhang
Yufei Liu
author_facet Xiaohui Zhang
Yufei Liu
author_sort Xiaohui Zhang
collection DOAJ
description Abstract Aiming at the optimal scheduling problem of virtual power plant (VPP) with multiple uncertainties on the source‐load side, this paper proposes a two‐stage stochastic robust optimal scheduling method considering the uncertainty of the source‐load side. This method combines the characteristics of robust optimization and stochastic optimization to model the source‐load uncertainty differentiation. The Wasserstein generative adversarial network with gradient penalty (WGAN‐GP) is used to generate electric and thermal load scenarios, and then K‐medoids clustering is used to obtain several typical scenarios. The min–max–min two‐stage stochastic robust optimization model is constructed, and the column constraint generation (C&CG) algorithm and dual theory are used to solve the problem, and the scheduling scheme with the lowest operating cost in the worst scenario is obtained.
format Article
id doaj-art-e95e3dfed90743ff8a350d5feafa67b7
institution Kabale University
issn 2577-8196
language English
publishDate 2024-12-01
publisher Wiley
record_format Article
series Engineering Reports
spelling doaj-art-e95e3dfed90743ff8a350d5feafa67b72024-12-16T03:09:12ZengWileyEngineering Reports2577-81962024-12-01612n/an/a10.1002/eng2.13005Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertaintyXiaohui Zhang0Yufei Liu1School of Electric Power Shenyang Institute of Engineering Shenyang Liaoning Province ChinaSchool of Electric Power Shenyang Institute of Engineering Shenyang Liaoning Province ChinaAbstract Aiming at the optimal scheduling problem of virtual power plant (VPP) with multiple uncertainties on the source‐load side, this paper proposes a two‐stage stochastic robust optimal scheduling method considering the uncertainty of the source‐load side. This method combines the characteristics of robust optimization and stochastic optimization to model the source‐load uncertainty differentiation. The Wasserstein generative adversarial network with gradient penalty (WGAN‐GP) is used to generate electric and thermal load scenarios, and then K‐medoids clustering is used to obtain several typical scenarios. The min–max–min two‐stage stochastic robust optimization model is constructed, and the column constraint generation (C&CG) algorithm and dual theory are used to solve the problem, and the scheduling scheme with the lowest operating cost in the worst scenario is obtained.https://doi.org/10.1002/eng2.13005optimal schedulingstochastic robust optimizationuncertaintyvirtual power plant
spellingShingle Xiaohui Zhang
Yufei Liu
Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty
Engineering Reports
optimal scheduling
stochastic robust optimization
uncertainty
virtual power plant
title Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty
title_full Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty
title_fullStr Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty
title_full_unstemmed Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty
title_short Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty
title_sort two stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty
topic optimal scheduling
stochastic robust optimization
uncertainty
virtual power plant
url https://doi.org/10.1002/eng2.13005
work_keys_str_mv AT xiaohuizhang twostagestochasticrobustoptimalschedulingofvirtualpowerplantconsideringsourceloaduncertainty
AT yufeiliu twostagestochasticrobustoptimalschedulingofvirtualpowerplantconsideringsourceloaduncertainty