Investigation of the Operational Character of «Galit Wastes - Clay-Salt Slimes» System

The paper contains the results of experimental research. The purpose of the research is to investigate operational character of «Galit Wastes - Clay-Salt Slimes» system under various schemes of its loading. Investigations have been carried out with the help of pilot plant which models fragment of a...

Full description

Saved in:
Bibliographic Details
Main Authors: G. G. Kruglov, N. D. Bannikov, N. N. Linkevich
Format: Article
Language:Russian
Published: Belarusian National Technical University 2003-08-01
Series:Наука и техника
Online Access:https://sat.bntu.by/jour/article/view/1622
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The paper contains the results of experimental research. The purpose of the research is to investigate operational character of «Galit Wastes - Clay-Salt Slimes» system under various schemes of its loading. Investigations have been carried out with the help of pilot plant which models fragment of a dike and a slime storage in 1:25 scale. It has been revealed that at the initial stage of clay-salt slime loading the whole load is transferred to water. Due to this excess thrust is brought about in the soil medium. Next stages of clay-salt slime loading depend on dissipation period of excess thrust. Filling of galit wastes on clay-salt slimes leads to their strengthening in 7 - 10 days. This process is accompanied by the formation of soil layer with partial crystallization.
ISSN:2227-1031
2414-0392