Renovation Scheme of TCM100 Track Circuit

[Objective] The initial application of TCM100 track circuit in China is in Shenzhen Metro Line 4 and Guangzhou Metro Line 8. During the early stage of equipment maintenance and repair, certain drawbacks in the power supply mode of the original TCM (track circuit module) group were detected. Replacin...

Full description

Saved in:
Bibliographic Details
Main Author: CHENG Lei
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2025-01-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.047.html
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841543650418360320
author CHENG Lei
author_facet CHENG Lei
author_sort CHENG Lei
collection DOAJ
description [Objective] The initial application of TCM100 track circuit in China is in Shenzhen Metro Line 4 and Guangzhou Metro Line 8. During the early stage of equipment maintenance and repair, certain drawbacks in the power supply mode of the original TCM (track circuit module) group were detected. Replacing a single TCM module would affect the functions and displays of multiple track sections, and equipment failures occur frequently when TCM modules are replaced. Therefore, it is necessary to renovate the TCM100 track circuit. [Method] Based on a research of the TCM group in TCM100 track circuit, the defects existing in the "TCM Maintenance Manual" provided by Siemens AG and the power supply mode design of the TCM are pointed out, and a renovation scheme for the TCM100 track circuit is proposed. On the test track of a depot, the TCM replacement test on the renovated TCM100 track circuit is carried out. [Result & Conclusion] The renovation scheme of TCM100 track circuit is as follows: The single Wago terminal connected to the original positive electrode wire is replaced with three Wago terminals equipped with air switches, aiming to control the positive electrode power supply of the three TCM modules respectively, while the negative electrode power supply remains unchanged, thus realizing independent power supply of each module. The TCM module replacement test determines the optimal replacement method and proves the effectiveness of the track circuit renovation scheme.
format Article
id doaj-art-e508a965acad424e87b8ff7c5ec6b183
institution Kabale University
issn 1007-869X
language zho
publishDate 2025-01-01
publisher Urban Mass Transit Magazine Press
record_format Article
series Chengshi guidao jiaotong yanjiu
spelling doaj-art-e508a965acad424e87b8ff7c5ec6b1832025-01-13T08:04:42ZzhoUrban Mass Transit Magazine PressChengshi guidao jiaotong yanjiu1007-869X2025-01-0128125826110.16037/j.1007-869x.2025.01.047Renovation Scheme of TCM100 Track CircuitCHENG Lei0Guangzhou Metro Group Co, Ltd, 510400, Guangzhou, China[Objective] The initial application of TCM100 track circuit in China is in Shenzhen Metro Line 4 and Guangzhou Metro Line 8. During the early stage of equipment maintenance and repair, certain drawbacks in the power supply mode of the original TCM (track circuit module) group were detected. Replacing a single TCM module would affect the functions and displays of multiple track sections, and equipment failures occur frequently when TCM modules are replaced. Therefore, it is necessary to renovate the TCM100 track circuit. [Method] Based on a research of the TCM group in TCM100 track circuit, the defects existing in the "TCM Maintenance Manual" provided by Siemens AG and the power supply mode design of the TCM are pointed out, and a renovation scheme for the TCM100 track circuit is proposed. On the test track of a depot, the TCM replacement test on the renovated TCM100 track circuit is carried out. [Result & Conclusion] The renovation scheme of TCM100 track circuit is as follows: The single Wago terminal connected to the original positive electrode wire is replaced with three Wago terminals equipped with air switches, aiming to control the positive electrode power supply of the three TCM modules respectively, while the negative electrode power supply remains unchanged, thus realizing independent power supply of each module. The TCM module replacement test determines the optimal replacement method and proves the effectiveness of the track circuit renovation scheme.https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.047.htmlrail transittcm100 track circuittrack circuit renovationtcm module
spellingShingle CHENG Lei
Renovation Scheme of TCM100 Track Circuit
Chengshi guidao jiaotong yanjiu
rail transit
tcm100 track circuit
track circuit renovation
tcm module
title Renovation Scheme of TCM100 Track Circuit
title_full Renovation Scheme of TCM100 Track Circuit
title_fullStr Renovation Scheme of TCM100 Track Circuit
title_full_unstemmed Renovation Scheme of TCM100 Track Circuit
title_short Renovation Scheme of TCM100 Track Circuit
title_sort renovation scheme of tcm100 track circuit
topic rail transit
tcm100 track circuit
track circuit renovation
tcm module
url https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.047.html
work_keys_str_mv AT chenglei renovationschemeoftcm100trackcircuit