Workforce scheduling with synchronization constraints and ergonomic aspects at cross dock platforms
This research studied a practical scheduling problem arising in the repackaging phase of cross-dock platforms. Packaging/repackaging is one of the significant concerns in cross-dock internal operations, where most of the tasks have been done by a number limited of teams. The problem also contains ma...
Saved in:
Main Authors: | Alpaslan Fığlalı, Parmis Shahmalekı |
---|---|
Format: | Article |
Language: | English |
Published: |
Sakarya University
2021-02-01
|
Series: | Sakarya Üniversitesi Fen Bilimleri Enstitüsü Dergisi |
Subjects: | |
Online Access: | https://dergipark.org.tr/tr/download/article-file/1155527 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Comparison of Welch Powell Algorithm and Greedy Algorithm in Odd Semester Lecture Room Scheduling Optimization Faculty of Computer Science
by: Alif Nur Fadilah, et al.
Published: (2024-10-01) -
Scheduling strategy for science workflow with deadline constraint on multi-cloud
by: Bing LIN, et al.
Published: (2018-01-01) -
Low-Cost Ergonomic Interventions to Reduce Risk Factors for Work-Related Musculoskeletal Disorders in the Denture Fabrication Workforce
by: Mega Cattleya P.A. Islami, et al.
Published: (2025-01-01) -
Efficient Task Scheduling Using Constraints Programming for Enhanced Planning and Reliability
by: JaeBong Cho, et al.
Published: (2024-12-01) -
ERGONOMIC ASPECTS OF TEACHING
by: Elena S. Yatsenko, et al.
Published: (2022-05-01)