Design and Execvtion of Foundation Excavation Scheme for Extention Project of Yingnahe Reservoir
Saved in:
Main Authors: | 李亮, 陆克发, 麻王斌 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2002-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47672537&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Temperature Control of Dam Concrete during Construction in Summer for Yingnahe Reservoir Expansion Project
by: 黄堰江, et al.
Published: (2004-01-01) -
Application of Draw Plate in Extension Project of Yingnahe Reservoir
by: LU Ke-fa
Published: (2005-01-01) -
Construction of Yingnahe Reservoir Expansion Project with Treating the New Dam Surface in Combination with the Old One
by: LU Ke-fa
Published: (2005-01-01) -
Selection and Comparison of Support Schemes of Deep Excavation in Soft Foundation for Xixi Powerhouse of Chaozhou Water Supply Project
by: JIANG Hong-da
Published: (2005-01-01) -
Optimization of Construction Schemes for Excavation of Main Tunnel of Draft Tube of Baise Project
by: WANG Yang
Published: (2006-01-01)