Technique of Construction of F7 Hole in Fault Zone in Spillway Tunnel in Xiaowan Hydroelectricity Station
Saved in:
Main Authors: | LI Wei, LIU Xue-song |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2009-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47660119&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Construction Technology of Excavation and Blasting for Left Bank Abutment Slot of Xiaowan Hydropower Station
by: LIU Hong-bao, et al.
Published: (2005-01-01) -
Implementation of Security Standardization in Construction of No.3 and No.4 West Diversion Tunnel in Jinping Phase 2 Hydroelectric Station
by: WANG Zhi, et al.
Published: (2010-01-01) -
General Introduction to Control of Nabi Hydroelectric Station Construction Process
by: SONG Dong-fang, et al.
Published: (2010-01-01) -
Effects of Opened and Closed Spillway Operations of a Large Tropical Hydroelectric Dam on the Water Quality of the Downstream River
by: Fiona-Annilow Wera, et al.
Published: (2019-01-01) -
Construction Technique of Tunnel Transiting Faulted Rupture Zone in Water Supply Project in the Eastern Shenzhen City
by: WANG Xiao-xing
Published: (2006-01-01)