Construction and Control of Earth Filling for Auxiliary Dam of Baise Project
Saved in:
Main Authors: | WANG Lang, DONG Ze-ping |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2006-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47667407&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design of Auxiliary Dam of Baise Project
by: CHEN Gong-jian, et al.
Published: (2006-01-01) -
Application of Distorted Concrete in the Construction of Baise Project's Main Dam
by: ZHANG Zheng-guo, et al.
Published: (2006-01-01) -
RCC Main Dam of Baise Project under Construction
by: HE Shao-run
Published: (2006-01-01) -
Arrangement of Observation Installation for the Dam of Baise Project and Preliminary Measurement Results
by: CHEN Shun-tian, et al.
Published: (2006-01-01) -
Progress in Baise Water Project Construction
Published: (2006-01-01)