Layout of Release Works and Design of Revetment of Lagdo Hydropower Station

The Lagdo Hydropower Station has a storage volume of 8.69 billion m3 and an installed capacity of 72 MW. The clay core rockfill dam is 40m high with its release works consisting of a spillway and a release outlet. The release outlet is arranged on the right bank of the main dam and is a free-flow tu...

Full description

Saved in:
Bibliographic Details
Main Author: WANG Yi-zhui
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2001-01-01
Series:Renmin Zhujiang
Online Access:http://www.renminzhujiang.cn/thesisDetails?columnId=47672667&Fpath=home&index=0
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841533851124367360
author WANG Yi-zhui
author_facet WANG Yi-zhui
author_sort WANG Yi-zhui
collection DOAJ
description The Lagdo Hydropower Station has a storage volume of 8.69 billion m3 and an installed capacity of 72 MW. The clay core rockfill dam is 40m high with its release works consisting of a spillway and a release outlet. The release outlet is arranged on the right bank of the main dam and is a free-flow tunnel for diversion, flood disposal and emptying the reservioir. The tunnel is in the form of an archway, with its mouth expanding toward both sides and dissipating energy by continuous deflector. Next comes the 550m long tailrace directing the flow into the main river bed. The spillway is 42m in width in average with bucket to dissipate energy. Behind the bucket is a 20m long apron. Situated on the left bank, the headrace channel is a structure for diversion, flood disposal, power generation and irrigation. After completion, it has been shown that the project layout is reasonable and the dam works satisfactorily in flood detention. However, scouring in different degrees has occurred downstream the spillway and the release runnel. In the light of this situation, a revetment has been designed and constructed. The revetment works well since putting into operation.
format Article
id doaj-art-dcdb527f11c848de9d315d2bac458a2c
institution Kabale University
issn 1001-9235
language zho
publishDate 2001-01-01
publisher Editorial Office of Pearl River
record_format Article
series Renmin Zhujiang
spelling doaj-art-dcdb527f11c848de9d315d2bac458a2c2025-01-15T02:49:41ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352001-01-012247672667Layout of Release Works and Design of Revetment of Lagdo Hydropower StationWANG Yi-zhuiThe Lagdo Hydropower Station has a storage volume of 8.69 billion m3 and an installed capacity of 72 MW. The clay core rockfill dam is 40m high with its release works consisting of a spillway and a release outlet. The release outlet is arranged on the right bank of the main dam and is a free-flow tunnel for diversion, flood disposal and emptying the reservioir. The tunnel is in the form of an archway, with its mouth expanding toward both sides and dissipating energy by continuous deflector. Next comes the 550m long tailrace directing the flow into the main river bed. The spillway is 42m in width in average with bucket to dissipate energy. Behind the bucket is a 20m long apron. Situated on the left bank, the headrace channel is a structure for diversion, flood disposal, power generation and irrigation. After completion, it has been shown that the project layout is reasonable and the dam works satisfactorily in flood detention. However, scouring in different degrees has occurred downstream the spillway and the release runnel. In the light of this situation, a revetment has been designed and constructed. The revetment works well since putting into operation.http://www.renminzhujiang.cn/thesisDetails?columnId=47672667&Fpath=home&index=0
spellingShingle WANG Yi-zhui
Layout of Release Works and Design of Revetment of Lagdo Hydropower Station
Renmin Zhujiang
title Layout of Release Works and Design of Revetment of Lagdo Hydropower Station
title_full Layout of Release Works and Design of Revetment of Lagdo Hydropower Station
title_fullStr Layout of Release Works and Design of Revetment of Lagdo Hydropower Station
title_full_unstemmed Layout of Release Works and Design of Revetment of Lagdo Hydropower Station
title_short Layout of Release Works and Design of Revetment of Lagdo Hydropower Station
title_sort layout of release works and design of revetment of lagdo hydropower station
url http://www.renminzhujiang.cn/thesisDetails?columnId=47672667&Fpath=home&index=0
work_keys_str_mv AT wangyizhui layoutofreleaseworksanddesignofrevetmentoflagdohydropowerstation