Analysis and Design of Electricity Consumption of Power House in Hydropower Station with Bulb Turbine
Saved in:
Main Authors: | ZHI Yong-ming, CHEN Youg-li |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2009-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47660979&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design and Operation of Bulb Tubular Turbines for Baishiyao Hydropower Station
by: 杨类琪, et al.
Published: (2003-01-01) -
Knowledge in Designing Hydropower Station with Tubular Bulb Units
by: 翁映标
Published: (2003-01-01) -
Effect of Cavitation with Vibration on the Powerhouse Structure of Bulb Turbines Installed in Hydropower Stations
by: Praveen S, et al.
Published: (2022-01-01) -
Relation between Layouts of Electro- mechanical Equipment and Powerhouse in Hydropower Station with Bulb Tubular Units
by: FU Xia-bi, et al.
Published: (2005-01-01) -
Design of Power-house of Changtan Hydropower Plant
by: 李少科
Published: (2004-01-01)