Estimation of stability of lifting equipment during excavation of pits in cramped conditions

Introduction. The paper illustrates the necessity and place of the problem of stability assessment of lifting devices applied for excavation in cramped conditions, which are typical for urban areas with dense urban development when laying underground transport facilities on the example of the open m...

Full description

Saved in:
Bibliographic Details
Main Authors: N. S. Nikitina, N. K. Melnikov
Format: Article
Language:English
Published: Moscow State University of Civil Engineering (MGSU) 2024-02-01
Series:Vestnik MGSU
Subjects:
Online Access:https://www.vestnikmgsu.ru/jour/article/view/186
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841553485832650752
author N. S. Nikitina
N. K. Melnikov
author_facet N. S. Nikitina
N. K. Melnikov
author_sort N. S. Nikitina
collection DOAJ
description Introduction. The paper illustrates the necessity and place of the problem of stability assessment of lifting devices applied for excavation in cramped conditions, which are typical for urban areas with dense urban development when laying underground transport facilities on the example of the open method of works on the construction of the Moscow Metro.Materials and methods. Two sites on the territory of Moscow and different cranes of Liebherr company were considered in order to investigate the influence of geotechnical parameters on stability and safety of heavy lifting equipment. In addition, numerical modelling was carried out to determine displacements and deformations at different locations of the crane with respect to the excavation fence.Results. Horizontal and vertical displacements and total deformations of the pit fence were obtained by means of numerical modelling with the use of geotechnical software systems PLAXIS 2D and PLAXIS 3D. Among other things, we analyzed the usage of PAG slabs, as well as construction of the top tier of the spacing system with the use of 1.5 × 1.5 m inventory slabs.Conclusions. The relevant issue is an analytical calculation for situations that can arise in solving practical problems, in particular, in the development of the project of works for the installation of a lifting device near the pit with a fence. Surface layers of soils (up to 6 m) have a special and primary influence on the result of the calculation. If the lifting device is installed in bulk soil of natural origin, it is mandatory to replace it with a harder soil or to lay additional concrete slabs with a larger area to reduce the direct load on the ground. In special cases, the numerical modelling should be performed separately for heavy truck cranes with a lifting capacity of 250 tons and more, provided that the guardrail is made without a spacing system (“cantilever type”).
format Article
id doaj-art-d893d2771d9146ac86d28e8c6a51f42e
institution Kabale University
issn 1997-0935
2304-6600
language English
publishDate 2024-02-01
publisher Moscow State University of Civil Engineering (MGSU)
record_format Article
series Vestnik MGSU
spelling doaj-art-d893d2771d9146ac86d28e8c6a51f42e2025-01-09T08:22:49ZengMoscow State University of Civil Engineering (MGSU)Vestnik MGSU1997-09352304-66002024-02-0119220321510.22227/1997-0935.2024.2.203-21582Estimation of stability of lifting equipment during excavation of pits in cramped conditionsN. S. Nikitina0N. K. Melnikov1Moscow State University of Civil Engineering (National Research University) (MGSU)Moscow State University of Civil Engineering (National Research University) (MGSU)Introduction. The paper illustrates the necessity and place of the problem of stability assessment of lifting devices applied for excavation in cramped conditions, which are typical for urban areas with dense urban development when laying underground transport facilities on the example of the open method of works on the construction of the Moscow Metro.Materials and methods. Two sites on the territory of Moscow and different cranes of Liebherr company were considered in order to investigate the influence of geotechnical parameters on stability and safety of heavy lifting equipment. In addition, numerical modelling was carried out to determine displacements and deformations at different locations of the crane with respect to the excavation fence.Results. Horizontal and vertical displacements and total deformations of the pit fence were obtained by means of numerical modelling with the use of geotechnical software systems PLAXIS 2D and PLAXIS 3D. Among other things, we analyzed the usage of PAG slabs, as well as construction of the top tier of the spacing system with the use of 1.5 × 1.5 m inventory slabs.Conclusions. The relevant issue is an analytical calculation for situations that can arise in solving practical problems, in particular, in the development of the project of works for the installation of a lifting device near the pit with a fence. Surface layers of soils (up to 6 m) have a special and primary influence on the result of the calculation. If the lifting device is installed in bulk soil of natural origin, it is mandatory to replace it with a harder soil or to lay additional concrete slabs with a larger area to reduce the direct load on the ground. In special cases, the numerical modelling should be performed separately for heavy truck cranes with a lifting capacity of 250 tons and more, provided that the guardrail is made without a spacing system (“cantilever type”).https://www.vestnikmgsu.ru/jour/article/view/186geotechnical characteristicslifting craneengineering and geological conditionspitundergroundopen method of worksnumerical modelling
spellingShingle N. S. Nikitina
N. K. Melnikov
Estimation of stability of lifting equipment during excavation of pits in cramped conditions
Vestnik MGSU
geotechnical characteristics
lifting crane
engineering and geological conditions
pit
underground
open method of works
numerical modelling
title Estimation of stability of lifting equipment during excavation of pits in cramped conditions
title_full Estimation of stability of lifting equipment during excavation of pits in cramped conditions
title_fullStr Estimation of stability of lifting equipment during excavation of pits in cramped conditions
title_full_unstemmed Estimation of stability of lifting equipment during excavation of pits in cramped conditions
title_short Estimation of stability of lifting equipment during excavation of pits in cramped conditions
title_sort estimation of stability of lifting equipment during excavation of pits in cramped conditions
topic geotechnical characteristics
lifting crane
engineering and geological conditions
pit
underground
open method of works
numerical modelling
url https://www.vestnikmgsu.ru/jour/article/view/186
work_keys_str_mv AT nsnikitina estimationofstabilityofliftingequipmentduringexcavationofpitsincrampedconditions
AT nkmelnikov estimationofstabilityofliftingequipmentduringexcavationofpitsincrampedconditions