Design of the Online Gross γ Monitoring Instrument at the Exit of the Helium Purification System in HTR-PM
After the successful construction and operation experience of the 10 MW high-temperature gas-cooled reactor (HTR-10), a high-temperature gas-cooled pebble-bed modular (HTR-PM) demonstration plant is under construction in Shidao Bay, Rongcheng City, Shandong province, China. An online gross γ monitor...
Saved in:
Main Authors: | Mengqi Lou, Liguo Zhang, Feng Xie, Jianzhu Cao, Jiejuan Tong, Weirong Liu, Yong Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2018-01-01
|
Series: | Science and Technology of Nuclear Installations |
Online Access: | http://dx.doi.org/10.1155/2018/5808352 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Minimum detectable activity concentration of online monitoring instrument in primary circuit of HTR-PM based on Monte Carlo simulation
by: Rui Nie, et al.
Published: (2025-01-01) -
Radiation Protection Practices during the Helium Circulator Maintenance of the 10 MW High Temperature Gas-Cooled Reactor-Test Module (HTR-10)
by: Chengxiang Guo, et al.
Published: (2016-01-01) -
Transient Study on the HTR-PM with TINTE-vPower Coupling Code Package
by: Jun Sun, et al.
Published: (2020-01-01) -
Numerical Study of the Air Ingress Accident of the HTR-PM and Possible Mitigation Measures
by: Wei Xu, et al.
Published: (2020-01-01) -
Design, Experiment, and Commissioning of the Spent Fuel Conveying and Loading System of HTR-PM
by: Bin Wu, et al.
Published: (2022-01-01)