Data-driven automated job shop scheduling optimization considering AGV obstacle avoidance
Abstract The production stage of an automated job shop is closely linked to the automated guided vehicle (AGV), which needs to be planned in an integrated manner to achieve overall optimization. In order to improve the collaboration between the production stages and the AGV operation system, a two-l...
Saved in:
Main Authors: | Qi Tang, Huan Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Nature Portfolio
2025-01-01
|
Series: | Scientific Reports |
Subjects: | |
Online Access: | https://doi.org/10.1038/s41598-024-82870-1 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Improving the job shop scheduling algorithm to minimize total penalty costs considering maintenance activity
by: Puryani Puryani, et al.
Published: (2024-12-01) -
MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation
by: Shiming Yang, et al.
Published: (2025-01-01) -
Research of Dynamic Obstacle Avoidance of Manipulator based on Artificial Potential Field Method of Velocity Field
by: Shi Yafei, et al.
Published: (2020-04-01) -
Preference learning based deep reinforcement learning for flexible job shop scheduling problem
by: Xinning Liu, et al.
Published: (2025-01-01) -
Integrated Scheduling of Multi-Objective Job Shops and Material Handling Robots with Reinforcement Learning Guided Meta-Heuristics
by: Zhangying Xu, et al.
Published: (2024-12-01)