Implementation of Security Standardization in Construction of No.3 and No.4 West Diversion Tunnel in Jinping Phase 2 Hydroelectric Station
Saved in:
Main Authors: | WANG Zhi, WEI Li-na |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2010-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47659995&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Technique of Construction of F7 Hole in Fault Zone in Spillway Tunnel in Xiaowan Hydroelectricity Station
by: LI Wei, et al.
Published: (2009-01-01) -
General Introduction to Control of Nabi Hydroelectric Station Construction Process
by: SONG Dong-fang, et al.
Published: (2010-01-01) -
Failure Mechanism and Mitigation Measures of the G1002 Electricity Pylon Landslide at the Jinping I Hydropower Station
by: Gang Luo, et al.
Published: (2020-01-01) -
Fatigue characteristics of deep excavation-disturbed jinping marble
by: Anlin Zhang, et al.
Published: (2025-01-01) -
Study on Layout of Nansha Hydroelectric Station Complex in Honghe River(Red River)
by: WANG Meng, et al.
Published: (2010-01-01)