Scheme for Improving LKJ System Automatic Level
Present status of LKJ system application was stated, and LKJ system automatic level proving schemes were proposed with introduction of computer control priority mode, vehicle-ground transfer technology, Beidou Navigation Satellite system, wire-less communication network technology etc, which helped...
Saved in:
| Main Authors: | YANG Qing-xiang, YANG Hui-xin |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Department of Electric Drive for Locomotives
2013-01-01
|
| Series: | 机车电传动 |
| Subjects: | |
| Online Access: | http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2013.02.028 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
LMD On-board Equipment Based on Beidou Navigation and 5G Communication Technology
by: LIU Jianlin, et al.
Published: (2022-06-01) -
Research on LKJ-15C Intelligent Perception Technology for Train Operation Routes Based on BeiDou Differential Positioning and Computer Interlocking
by: SU Tianqi, et al.
Published: (2025-04-01) -
Research on Network Information Security Risk Analysis and Protection Strategy of LKJ Monitoring and Management Device
by: XIAO Lizhi, et al.
Published: (2022-02-01) -
Research on the Data Technology of LKJ-15 System
by: FANG Guanghua
Published: (2018-01-01) -
Design of Onboard Shunting Protection Software for Metro Engineering Vehicles Based on BeiDou Satellite Positioning System
by: LIU Hao, et al.
Published: (2023-08-01)