Treatment of Cracks in Dam Toe with Chemical Grouting for Gudongkou Hydropower Station
Saved in:
Main Authors: | 杨学红, 胡志根 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2002-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47672177&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
On the Construction Management of RCC Dam of Shankou Hydropower Station
by: 裴泽华, et al.
Published: (2001-01-01) -
Technical Measures for Construction of RCC Dam of Sankou Ⅲ Hydropower Station
by: 余红松, et al.
Published: (2002-01-01) -
Design and Quality Control of Mix Proportion of Concrete for the Dam of Pinghu Hydropower Station
by: 杨林
Published: (2004-01-01) -
Analysis of Stability of Abutment in Arch Dam of Jintan Hydropower Station
by: CHEN Liang
Published: (2009-01-01) -
Chemical Grouting Trial Engineering Operation in Lower Reservoir Dam of Huizhou Pumped Storage Power Station and Result Analysis
by: XU Xiu-mei, et al.
Published: (2011-01-01)