Analysis of Related Technical Problems of RCCD Ultra-long Core Samples Based on Huangdeng Hydropower Station
For the 24.6 m of the world's longest roller compacted concrete coresamples taken out during the quality inspection of RCCD (roller compacted concretedam) at Huangdeng Hydropower Station, in order to better analyze and summarize theexperience of roller compacted concrete construction technology...
Saved in:
Main Author: | HU Hongxia |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2020-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2020.10.013 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
General Design and Layout of Datengxia Hydropower Station
by: ZHANG Xiao, et al.
Published: (2022-01-01) -
Study on Optimal Utilization of Water Resources in Shiqiao Hydropower Station
by: ZHAO Yufeng
Published: (2021-01-01) -
Review on the Method of Compensation Benefit Allocation for Cascade Hydropower Stations
by: LI Yinghai, et al.
Published: (2020-01-01) -
Research and Practice on the Influence of Hydropower Station Construction on River Connectivity in the Process of Urbanization
by: WANG Shenfang, et al.
Published: (2022-01-01) -
Short-Term Optimal Scheduling Method of Cascade Hydropower Stations Based on Segmented Load Construction Strategy
by: LI Chonghao, et al.
Published: (2023-01-01)