Sub-activity Time-Cost Trade-off Model of Building Structural Beam on the Projects in the North Aceh Region
Problems for both delayed and accelerated activities in scheduling are common in most projects. This problem can implicate on the additional construction cost with different trends as a specific model. A model can provide valuable information to project acceleration judgement. This research aims to...
Saved in:
| Main Authors: | Fachrurrazi Fachrurrazi, Abdullah Abdullah, Yuwaldi Away, Teuku Budi Aulia |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Syiah Kuala University
2019-08-01
|
| Series: | Aceh International Journal of Science and Technology |
| Subjects: | |
| Online Access: | https://jurnal.usk.ac.id/AIJST/article/view/13218 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
OPTIMIZATION OF DOUBLY REINFORCED BEAM DESIGN USING SIMULATED ANNEALING
by: SIMON OLAYIWOLA ADEREMI OLAWALE, et al.
Published: (2020-07-01) -
Numerical Investigation on the Effects of Embedding PVC Pipes in Reinforced Concrete Beams.
by: Ampaire, Comboni
Published: (2024) -
Using Near-Surface-Mounted Small-Diameter Steel Wires to Improve Construction Efficiency in Strengthening Substandard Lapped Spliced Reinforced Concrete Beams
by: Sabry Fayed, et al.
Published: (2025-03-01) -
Flexural behavior of RC beams strengthened with CFRP sheets and ECC layers
by: Xiaobing Hou, et al.
Published: (2025-07-01) -
THE FLEXURAL BEHAVIOR OF COMPOSITE HYBRID CASTELLATED I-BEAM
by: kawthar hussien, et al.
Published: (2025-04-01)