Monitoring of Cracks in Arch Dam in Ertan Project and Analysis of Control Measures
Saved in:
Main Authors: | YANG Hong, XI Zhi-yong, Tu Xiang-yang |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2010-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47659061&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Jintan Arch Dam Concrete Temperature Control and Crack-proof Design
by: LI Zhou
Published: (2008-01-01) -
Effects of Outlets on Cracking Risk and Integral Stability of Super-High Arch Dams
by: Peng Lin, et al.
Published: (2014-01-01) -
Optimized Design of Jintan Arch Dam Shape
by: LI Yong
Published: (2007-01-01) -
Ant Colony Optimization Analysis on Overall Stability of High Arch Dam Basis of Field Monitoring
by: Peng Lin, et al.
Published: (2014-01-01) -
Discussion on Application of Cardioid to Horizontal Arch Ring of Arch Dam
by: ZHOU Bin
Published: (2020-01-01)