Design and Construction of Culvert Redevelopment with Conduit Jacking for Niangkeng Reservoir
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2001-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47672825&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841531375099838464 |
---|---|
author | 邱森才 |
author_facet | 邱森才 |
author_sort | 邱森才 |
collection | DOAJ |
format | Article |
id | doaj-art-c7d840e107b14cdbacbd2eeb4d9936ac |
institution | Kabale University |
issn | 1001-9235 |
language | zho |
publishDate | 2001-01-01 |
publisher | Editorial Office of Pearl River |
record_format | Article |
series | Renmin Zhujiang |
spelling | doaj-art-c7d840e107b14cdbacbd2eeb4d9936ac2025-01-15T02:49:50ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352001-01-012247672825Design and Construction of Culvert Redevelopment with Conduit Jacking for Niangkeng Reservoir邱森才http://www.renminzhujiang.cn/thesisDetails?columnId=47672825&Fpath=home&index=0 |
spellingShingle | 邱森才 Design and Construction of Culvert Redevelopment with Conduit Jacking for Niangkeng Reservoir Renmin Zhujiang |
title | Design and Construction of Culvert Redevelopment with Conduit Jacking for Niangkeng Reservoir |
title_full | Design and Construction of Culvert Redevelopment with Conduit Jacking for Niangkeng Reservoir |
title_fullStr | Design and Construction of Culvert Redevelopment with Conduit Jacking for Niangkeng Reservoir |
title_full_unstemmed | Design and Construction of Culvert Redevelopment with Conduit Jacking for Niangkeng Reservoir |
title_short | Design and Construction of Culvert Redevelopment with Conduit Jacking for Niangkeng Reservoir |
title_sort | design and construction of culvert redevelopment with conduit jacking for niangkeng reservoir |
url | http://www.renminzhujiang.cn/thesisDetails?columnId=47672825&Fpath=home&index=0 |
work_keys_str_mv | AT qiūsēncái designandconstructionofculvertredevelopmentwithconduitjackingforniangkengreservoir |