Introduction to the Development and Application of Software for Short-term Optimized Dispatch of Cascade Hydropower Stations
Saved in:
Main Authors: | MEI Ya-dong, ZHU Jiao-xin |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2000-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47675343&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of Power Generation Potential of Kaidu River Cascade Hydropower Stations Based on Simulation-Optimization Dispatching Framework
by: CHEN Hongbo, et al.
Published: (2024-01-01) -
Short-Term Optimal Scheduling Method of Cascade Hydropower Stations Based on Segmented Load Construction Strategy
by: LI Chonghao, et al.
Published: (2023-01-01) -
The Impact of Shuangjiangkou Hydropower Station on the Joint Dispatch of Power Generation and Navigation for Downstream Cascade Reservoirs
by: YANG Yi, et al.
Published: (2024-09-01) -
Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
by: Changjun Wang, et al.
Published: (2019-01-01) -
Current Vibration and Operation Dispatch of Discharging Sluice in Honghua Hydropower Station
by: ZHANG Zu-lin, et al.
Published: (2008-01-01)