Trust-driven job scheduling heuristics for computing grid

Currently existing grid scheduling algorithms largely ignore the impact of trust mechanism,which made their applicability in a realistic environment rather doubtful.Based on the grid trust model and trust utilization functions,a trust-driven grid job scheduling problem was proposed.Trust-driven Min-...

Full description

Saved in:
Bibliographic Details
Main Authors: ZHANG Wei-zhe1, LIU Xin-ran2, YUN Xiao-chun1, ZHANG Hong-li1, HU Ming-zeng1, LIU Kai-peng1
Format: Article
Language:zho
Published: Editorial Department of Journal on Communications 2006-01-01
Series:Tongxin xuebao
Subjects:
Online Access:http://www.joconline.com.cn/zh/article/74665986/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841537332006617088
author ZHANG Wei-zhe1
LIU Xin-ran2
YUN Xiao-chun1
ZHANG Hong-li1
HU Ming-zeng1
LIU Kai-peng1
author_facet ZHANG Wei-zhe1
LIU Xin-ran2
YUN Xiao-chun1
ZHANG Hong-li1
HU Ming-zeng1
LIU Kai-peng1
author_sort ZHANG Wei-zhe1
collection DOAJ
description Currently existing grid scheduling algorithms largely ignore the impact of trust mechanism,which made their applicability in a realistic environment rather doubtful.Based on the grid trust model and trust utilization functions,a trust-driven grid job scheduling problem was proposed.Trust-driven Min-min and Sufferage job scheduling heuristics were presented,which were extended based on traditional job scheduling strategies.The algorithms were evaluated with large scale simulation.Simulation result demonstrates trust-driven heuristics perform better than time-driven heuristic on average trust utility and total trust utility.
format Article
id doaj-art-c4d9094c49ae4548a32e59212abf839c
institution Kabale University
issn 1000-436X
language zho
publishDate 2006-01-01
publisher Editorial Department of Journal on Communications
record_format Article
series Tongxin xuebao
spelling doaj-art-c4d9094c49ae4548a32e59212abf839c2025-01-14T08:39:38ZzhoEditorial Department of Journal on CommunicationsTongxin xuebao1000-436X2006-01-01737974665986Trust-driven job scheduling heuristics for computing gridZHANG Wei-zhe1LIU Xin-ran2YUN Xiao-chun1ZHANG Hong-li1HU Ming-zeng1LIU Kai-peng1Currently existing grid scheduling algorithms largely ignore the impact of trust mechanism,which made their applicability in a realistic environment rather doubtful.Based on the grid trust model and trust utilization functions,a trust-driven grid job scheduling problem was proposed.Trust-driven Min-min and Sufferage job scheduling heuristics were presented,which were extended based on traditional job scheduling strategies.The algorithms were evaluated with large scale simulation.Simulation result demonstrates trust-driven heuristics perform better than time-driven heuristic on average trust utility and total trust utility.http://www.joconline.com.cn/zh/article/74665986/grid computinggrid securitytrust modeltrust-drivenjob scheduling
spellingShingle ZHANG Wei-zhe1
LIU Xin-ran2
YUN Xiao-chun1
ZHANG Hong-li1
HU Ming-zeng1
LIU Kai-peng1
Trust-driven job scheduling heuristics for computing grid
Tongxin xuebao
grid computing
grid security
trust model
trust-driven
job scheduling
title Trust-driven job scheduling heuristics for computing grid
title_full Trust-driven job scheduling heuristics for computing grid
title_fullStr Trust-driven job scheduling heuristics for computing grid
title_full_unstemmed Trust-driven job scheduling heuristics for computing grid
title_short Trust-driven job scheduling heuristics for computing grid
title_sort trust driven job scheduling heuristics for computing grid
topic grid computing
grid security
trust model
trust-driven
job scheduling
url http://www.joconline.com.cn/zh/article/74665986/
work_keys_str_mv AT zhangweizhe1 trustdrivenjobschedulingheuristicsforcomputinggrid
AT liuxinran2 trustdrivenjobschedulingheuristicsforcomputinggrid
AT yunxiaochun1 trustdrivenjobschedulingheuristicsforcomputinggrid
AT zhanghongli1 trustdrivenjobschedulingheuristicsforcomputinggrid
AT humingzeng1 trustdrivenjobschedulingheuristicsforcomputinggrid
AT liukaipeng1 trustdrivenjobschedulingheuristicsforcomputinggrid