Study on Maximum Scour Depth at River Reach of Shantou Bay Subsea Tunnel Project

This paper studies the flow pattern and riverbed scouring at the river reach of Shantou Bay Subsea Tunnel Project through the river model test and analyzes the maximum scour depth of the riverbed near the project under unfavorable hydrological conditions.The results show that the maximum flood veloc...

Full description

Saved in:
Bibliographic Details
Main Authors: YANG Chen, GAO Shengjie, CHEN Guanming, ZHANG Shuohan
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2022-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.06.011
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This paper studies the flow pattern and riverbed scouring at the river reach of Shantou Bay Subsea Tunnel Project through the river model test and analyzes the maximum scour depth of the riverbed near the project under unfavorable hydrological conditions.The results show that the maximum flood velocity at the tunnel section is above 1.5 m/s under unfavorable hydrological conditions,and riverbed scouring is obvious in the main channels of the left and right branches.The maximum scour depth of the riverbed at the tunnel site is 6.40 m and 5.24 m under the once-in-three-century and once-in-a-century hydrological conditions,respectively.The envelope results of the maximum scour depth at the tunnel section can provide a basis for determining the reasonable buried depth of the project,and the research results can provide reference for similar projects in Shantou Bay.