Performance and mechanism of modified backfill grouting materials prepared from EPB shield fine-grained waste soil for resource utilization
The construction process of the shield generates a considerable quantity of discharged soil. The residual fine-grained waste soil resulting from the discharge soil screening process is now classified as a new solid waste for disposal. In order to optimize the utilization of fine-grained waste soil,...
Saved in:
| Main Authors: | Dazeng Sun, Wen Zhao, Qian Bai, Yaochuang Han, Gaoyang Peng |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Elsevier
2025-07-01
|
| Series: | Case Studies in Construction Materials |
| Subjects: | |
| Online Access: | http://www.sciencedirect.com/science/article/pii/S2214509525005972 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of Grouting Reinforcement Scope and Excavation Scheme for Shield Tunnel Link Passage
by: WANG Bo, et al.
Published: (2025-06-01) -
Preparation and properties of pea-gravel grouting with sodium bentonite for hydraulic shield tunnel
by: Changyong Li, et al.
Published: (2025-07-01) -
Extent and control standards of grouting reinforcement for underwater karst shield tunnels
by: Peng Xu, et al.
Published: (2025-06-01) -
Experimental study on grouting diffusion and reinforcement law of grouting backfilling mining in caving zone
by: Zhihua Li, et al.
Published: (2025-04-01) -
Development and engineering application validation of alkali-activated full-component shield tunnel spoil regenerated solid-waste grouting material
by: Zhiran Yang, et al.
Published: (2025-09-01)