Design and Construction Schedule for Underground Powerhouse Excavation of Shenzhen Pump Storage Plant
Saved in:
Main Author: | 潘伟 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2003-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47671977&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Research of Geostress Test in Underground Powerhouse Area of a Pumped Storage Power Station
by: GENG Bijun, et al.
Published: (2020-01-01) -
Underground Plant Stack Construction Technology of Pumped Storage Power Station
by: XU Xiaodong
Published: (2023-01-01) -
Construction Practice of 50t Prestressed Anchor Bars in the Underground Powerhouse of Xiaolangdi Project
by: 黄红万, et al.
Published: (2004-01-01) -
Approach to Stability Analysis for Surrounding Rock of Underground Powerhouse
by: LIU Yuan-xun, et al.
Published: (2005-01-01) -
Assessment of the Excavation Damaged Zones in the Surrounding Rock of an Underground Powerhouse under High In Situ Stress Using an Acoustic Velocity Detecting Method
by: Liguo Zhang, et al.
Published: (2020-01-01)